Speed: 

Hub Disassembly Procedure

1

Remove the Inflation Valve Assembly.

1.1

Remove Cap (TRRVC9)

1.2

Remove Core (TRC2)

1.3

Remove Stem (TRJ780-02L)

1.4

Remove/Discard O-Ring (M23461-4-905)

2

Remove the Nuts, Bolts and Washers.

2.1

Remove Nuts (NAS1758L10)

2.2

Remove Washers (AH091335)

2.3

Remove Bolts (BAC40US10-32) and Washers (AH091334)

3

Separate O/B and I/B Hubs.

3.1

Separate O/B Hub (AHA2349)

3.2

Separate I/B Hub (AHA2350)

3.3

Remove/Discard O-Ring Seal (M83461-1-289)

4

Remove the parts from the I/B and O/B Hubs.

4.1

Remove Circlip (DAS2349-168)

4.2

Remove Grease retainer (AHM10353)

4.3

Remove Bearing (DSR4626-1098)

4.4

Remove Grease dam (AHM10353)

4.5

Remove Circlip (DAS2349-172)

4.6

Remove Grease retainer (AHM10354)

4.7

Remove Bearing (DSR4628-1099)

4.8

Remove Grease dam (AHM10352)

5

Remove the parts from the O/B Hub.

5.1

Remove Blanking Plugs (AHO91248)

5.2

Remove Safety Plug (AHO88790)

5.3

Remove O-ring Seal (NAS1601-112)

5.4

Remove/Discard O-ring Seal (M83461-4-906)

5.5

Remove Fillister Screws (MS35276-263)

5.6

Remove Washers (NAS1149-0363)

5.7

Remove Blanking Plug (MS9902-05)

5.8

Remove/Discard O-ring Seal (M83461-4-905)